január 16 2017 0Comment
Featured Video Play Icon

4.500 M² For D’Hollander Equipment In The Port Of Antwerp

Majestic. The term is an understatement in an attempt to describe the new building of D’Hollander Equipment. The steel building which the recycling company ordered to be built in Kallo covers an area of no less than 4,500 square metres. „With a 50m free span, a length of 90m and an impressive height of 12m, Frisomat completed a project of unprecedented size in the Port of Antwerp”, says Guy Somers. Frisomat designed and produced the building, and completed the assembly in less than two months – at record speed.

info_x338q5v6